The electrical system has been rewired. The sockets which had previously been mounted on the exterior walls have been removed and the supply cables connected directly to the main fuse panel. The electrician who worked here must have had some sort of training, but apparently not in electrics.

The clothing has been distributed in small lots and the desks have been assembled. We need to find more bolts to finish putting the slide together.

It’s rained quite a lot again and it’s pretty chilly here. We can’t remember wanting to put a sweater on during the day because it was a bit cold.

The water tank has been stripped of building materials on the inside, and can be filled with rainwater as soon as the drainpipes are connected.